Building a Custom Home in Florida
From buying the lot to the certificate of occupancy, in the order it happens
Building a custom home in Florida usually costs more per square foot than buying a resale house, and the benchmark to beat is Zillow's statewide typical single-family value of about $396,809. People build anyway because they want a specific lot, layout or level of storm resistance that the resale market doesn't offer, and the process works best when you treat land, loan, permits and builder as four separate decisions.
- Typical home value
- $375K Florida, Zillow, September 2026
- Past year
- −0.9%
- Past 5 years
- +18.6%
Start with the land, not the floor plan
The lot sets most of your costs before any design work begins. Before you buy one, check:
- Zoning and setbacks: how large a house the parcel allows, height limits, and whether the lot is in an HOA with architectural review.
- Flood zone and base flood elevation: in a FEMA A or V zone, the finished floor must be at or above the base flood elevation plus any local freeboard. Raising a slab or building on stem walls or pilings adds real cost.
- Soil and wetlands: a geotechnical report shows whether the soil can carry a slab or needs fill, compaction or piling. Wetlands on a lot can shrink the buildable area and trigger permits.
- Utilities: city water and sewer, or a well and septic system. Septic needs a permit and a soil evaluation; some areas restrict new conventional systems near waterways.
- Impact fees and connection fees: charged by many counties and cities on new construction. Ask the building department for the current schedule.
- Survey and title: a boundary survey and a title search on the land, the same as any purchase.
Land prices follow the same map as home prices. County values on Zillow's index range from about $166,734 in Calhoun to $962,885 in Monroe, and lots follow that spread.
Zillow Home Value Index, mid-tier, seasonally adjusted. Hover to see any date.
Data table
| Month | All homes |
|---|---|
| Dec 2012 | $137,888 |
| Dec 2013 | $159,013 |
| Dec 2014 | $174,323 |
| Dec 2015 | $191,493 |
| Dec 2016 | $208,002 |
| Dec 2017 | $224,615 |
| Dec 2018 | $240,223 |
| Dec 2019 | $250,318 |
| Dec 2020 | $272,004 |
| Dec 2021 | $332,010 |
| Dec 2022 | $393,135 |
| Dec 2023 | $400,867 |
| Dec 2024 | $396,947 |
| Dec 2025 | $376,536 |
| Sep 2026 | $375,361 |
How construction loans work
A regular mortgage won't pay for a house that doesn't exist yet. The common options:
- Construction-to-permanent (one-time close): a single loan that funds the build and then converts to a standard mortgage. One set of closing costs; you lock terms at the start.
- Two-time close: a short-term construction loan, then a separate mortgage when the house is finished. More flexibility, two closings and two sets of costs.
- Lot loan: to buy land now and build later. Expect a larger down payment than on a house.
During construction the lender releases money in draws as stages are completed and inspected: foundation, framing, dry-in, mechanicals, finishes. You usually pay interest only on what has been drawn. Lenders review the builder too, asking for license, insurance, financial references and a detailed budget. If you own the lot outright, its equity can often count toward the down payment.
Florida mortgage taxes apply: documentary stamp tax on the note at $0.35 per $100 and intangible tax of 0.2% of the loan amount.
- Monroe County$963K
- Walton County$661K
- Collier County$552K
- Miami-Dade County$523K
- St. Johns County$493K
- Nassau County$485K
- Palm Beach County$476K
- Martin County$448K
- Broward County$422K
- Franklin County$422K
- Manatee County$408K
- Gulf County$404K
Show all 67
- Orange County$401K
- Seminole County$400K
- Sarasota County$399K
- Sumter County$388K
- Hillsborough County$376K
- St. Lucie County$371K
- Pinellas County$369K
- Indian River County$364K
- Lake County$360K
- Osceola County$359K
- Okaloosa County$353K
- Santa Rosa County$351K
- Flagler County$350K
- Bay County$343K
- Brevard County$342K
- Clay County$335K
- Lee County$334K
- Pasco County$328K
- Volusia County$325K
- Baker County$314K
- Gilchrist County$306K
- Hernando County$306K
- Jefferson County$306K
- Alachua County$299K
- Charlotte County$299K
- Polk County$296K
- Duval County$294K
- Leon County$291K
- Okeechobee County$289K
- Levy County$287K
- Wakulla County$286K
- Escambia County$280K
- Hendry County$270K
- Citrus County$269K
- Marion County$268K
- Columbia County$268K
- Suwannee County$267K
- Lafayette County$262K
- Glades County$257K
- Union County$257K
- Bradford County$253K
- De Soto County$250K
- Hardee County$235K
- Highlands County$231K
- Washington County$221K
- Dixie County$218K
- Putnam County$216K
- Hamilton County$207K
- Madison County$206K
- Liberty County$201K
- Gadsden County$200K
- Taylor County$197K
- Holmes County$181K
- Jackson County$180K
- Calhoun County$167K
Zillow index, highest to lowest.
- Miami$584K
- Boca Raton$580K
- Miami Beach$531K
- Coral Springs$522K
- Miramar$520K
- Davie$515K
- Fort Lauderdale$510K
- Plantation$492K
- Pembroke Pines$487K
- Miami Gardens$474K
- Hialeah$444K
- Hollywood$442K
Show all 40
- Homestead$437K
- West Palm Beach$405K
- Boynton Beach$404K
- The Villages$392K
- Port St. Lucie$384K
- Tampa$376K
- Orlando$373K
- Riverview$363K
- Sunrise$361K
- Melbourne$358K
- Kissimmee$355K
- Brandon$353K
- St. Petersburg$352K
- Pompano Beach$350K
- Palm Coast$344K
- Clearwater$341K
- Largo$336K
- Cape Coral$335K
- Lakeland$309K
- Fort Myers$305K
- Palm Bay$303K
- Spring Hill$303K
- North Port$303K
- Deltona$298K
- Gainesville$292K
- Tallahassee$291K
- Jacksonville$285K
- Deerfield Beach$272K
Zillow index, highest to lowest.
Choosing and checking a builder
Florida requires contractors to hold a state certified or registered license. Look up any builder on the Florida Department of Business and Professional Regulation's license search, and confirm general liability and workers' compensation coverage. Ask for addresses of recent homes and talk to the owners.
Contract structure matters:
- Fixed price: the builder carries the risk of cost increases, usually with higher margins built in.
- Cost-plus: you pay actual costs plus a fee or percentage. Transparent, but your budget moves with material and labor prices.
- Allowances: amounts set aside for items like flooring, cabinets and fixtures. Low allowances make a bid look cheaper than it is.
- Change orders: every change after signing should be priced and signed in writing before work starts.
Florida's construction lien law
This is the part out-of-state buyers often miss. Under Florida's Construction Lien Law, subcontractors and suppliers who aren't paid by your builder can file a lien against your property, even if you already paid the builder. The protections are procedural:
- A Notice of Commencement is recorded with the county before work starts.
- Subcontractors and suppliers send you a Notice to Owner to preserve their lien rights. Keep every one.
- Before each draw, ask for lien releases from the parties who sent notices for the work being paid.
- At the end, get the contractor's final affidavit stating everyone has been paid.
A construction lender usually manages much of this through its draw process. If you pay cash, you or your attorney need to manage it. This isn't legal advice; for a custom build, having a real estate attorney review the construction contract is money well spent.
Permits, code and storm resistance
Every new house is permitted and inspected under the Florida Building Code, which includes some of the strictest wind requirements in the country. Much of the coast is in the wind-borne debris region, where windows and doors must be impact-rated or protected by approved shutters. The code sets a floor; a custom build lets you go above it with features such as a sealed roof deck, a hip roof, a higher-rated roof covering, impact glass throughout and a generator connection.
Those choices pay back in insurance. A new house with strong wind mitigation features usually gets a lower wind premium than an older resale home. Ask your insurance agent which features earn credits before you finalize plans, and order a wind mitigation inspection once the house is finished.
Florida does allow an owner-builder exemption, letting you act as your own contractor on a home for your own use after signing a disclosure statement with the building department. The law presumes you built for sale if you sell within a year of completion. It saves fees and puts every code, lien and safety obligation on you.
Timeline and the steps in order
- Budget and pre-approval: talk to a construction lender before you buy land.
- Buy the lot: with a survey, soil report, flood zone check and utility confirmation.
- Design: an architect or designer draws plans; an engineer signs off on structure and wind loads.
- Bids and contract: get at least two or three bids on the same plans.
- Permits: review times vary widely by county and city.
- Construction: commonly many months; weather, inspections and supply delays all extend it.
- Certificate of occupancy, final survey and elevation certificate: then the permanent loan closes or converts.
Insure the project during construction. Builder's risk coverage protects the house while it's going up; confirm whether you or the builder carries it.
Property tax and homestead on a new build
Florida assesses property as of January 1 each year. A house still under construction on January 1 may be assessed only for the land and partial improvements; the next year's bill reflects the finished home at full value. Budget for that jump.
If the house is your permanent residence and you live in it by January 1, you can apply for homestead by March 1 of that year. In 2026 homestead removes up to $51,411 from assessed value and caps future increases at 3% or CPI. Build it as a winter or second home and the exemption doesn't apply; the only protection is a 10% annual cap on the non-school part of the assessment. If you're weighing a custom build against an existing house, a shortlist of resale homes on comparable lots is the quickest way to price the premium for building.
Common questions
How much does it cost to build a house in Florida?
It depends heavily on location, lot preparation, size and finish level. Compare any build budget against resale prices: Zillow's statewide typical single-family value is about $396,809.
What is a construction-to-permanent loan?
A single loan that funds construction in draws and then converts to a standard mortgage when the house is done, with one closing.
Can I be my own builder in Florida?
Florida's owner-builder exemption lets you act as your own contractor on a home for your own use after signing a disclosure statement, but you take on all code, lien and safety responsibilities.
What is a Notice to Owner in Florida?
A notice from a subcontractor or supplier telling you they are working on your project and may file a lien if not paid. Collect lien releases from them before paying draws.
How long does it take to build a custom home in Florida?
Design, permits and construction together commonly take a year or more, depending on the county, the plans and weather.

Get a shortlist that fits your budget
Tell me what you're looking for and I'll send real listings with the full cost of owning each one: HOA or condo fees, property tax at your price, insurance, and closing costs. No newsletters, no pressure.
- MLS listings, including ones that just hit the market
- Condo budget, reserves and inspection history checked before you offer
- Fully remote if you need it: video tours, e-signing, wire to escrow
Or reach me directly: (754) 203-9632 · [email protected] · WhatsApp on the same number
Calculators for this purchase
Data: Zillow Home Value Index (ZHVI), Zillow Research, latest month September 2026; U.S. Census Bureau, American Community Survey 2020–2024 5-year estimates. Figures for small areas carry margins of error. These are planning numbers, not an appraisal of any property.